In late 2009, Baku-Tbilisi-Ceyhan Pipeline Company (BTC) selected TelcoPlus as the Contractor to undertake the Provision of Power Supplies to BTC/SCP Block Valve Sites in Azerbaijan. 19 Block Valve Sites to be connected to a reliable source of electrical power derived from the Azerenergie power generation and national grid systems. The project scope includes:
- Design & Documentation
- Procurement
- Obtaining necessary permits and technical conditions to allow the supply to be taken
- Remediation Works at tie-in points (substations, where required)
- Permanent and temporary acquisition of land associated with the High Voltage Overhead Line Poles
- High Voltage Overhead Line Poles Fabrication (welding, blasting, painting)
- Construction Works (Drilling, Erection, Compaction, Cable Pulling)
- Fit out of block valve transformer compound & transformers installation
- Commissioning & Handover
|